Questions? Call now!
English
English
Nederlands
Dutch
 
Deutsch
German
 
汉语
Chinese (Simplified)
 
Türk
Turkish
 
Call me back

AEM Phase 1 - PROJECTS

The phase 1 fermentation process is the first essential phase in the production of mushroom compost.  AEM is since the 1970s specialized in phase 1 bunker systems, and supplies the complete range of phase 1 products, including engineering, spigot floors, air distribution systems, high pressure fans and phase 1 computers and the required compost handling machinery. Based on many years of international experience, AEM can offer modern and optimal systems for the fermentation process.

PHASE 1 BUNKER - ENGINEERING

AEM can execute engineering works for phase 1 bunkers. With our own engineering team AEM covers all building technical and technical aspects of engineering phase 1 bunkers. The detailed engineering drawings and design information of the bunkers and spigot floors can be used by local architect and contractors. This way you can combine the latest international phase I knowhow with low local building costs!

PHASE 1 - BUNKERS

During the phase 1 bunker engineering process AEM determines the most effective design regarding dimensions, capacity and equipment for the bunkers. The engineering process will be executed together with the customer, so that local conditions and customer needs will be integrated from the start. AEM engineering integrates local available building materials and labour together with AEM air handling equipment, phase 1 computer and compost handling machinery. This way the most optimal design and cost effective set up can be achieved.

PHASE 1 - AIR HANDLING 

Phase 1 bunkers have to be equipped with high-pressure fans and manifolds that are connected to the spigot floor system. If required central exhaust systems in combination with acid air scrubbers and bio filters can be designed and supplied in case this would be required due to environmental regulations.

PHASE 1 - COMPUTER

To control the phase 1 fermentation process AEM supplies phase 1 bunker computers. The required process parameters can be inserted by the user in a logical and straight forward way. In combination with the measured oxygen level and temperatures the computer will control the phase 1 process in the most optimal way.

PHASE 1 - MACHINERY

Depending on the phase 1 set up as designed for each individual project, AEM can advice and supply you with compost mixing and filling machinery such as, bunker fillers, filling lines, mixing lines, overhead filling systems, compost transport conveyors and more.

Worldwide Innovation Since 1973